    Deploying NDT services in 2019 for Nghi Son Refinery and Petrochemical LLC

    Date Submitted 09/01/2025

    On May 14, 2019, Nghi Son Construction Site started implementing the contract of the NDT Daily 2019 package for Nghi Son Refinery and Petrochemical Plant with many NDT methods (RT, UT, UTM, MT, PT, HT, FT, PAUT, RFT, IRIS, Replica) and auxiliary work for NDT (including: installation, scaffolding, surface cleaning and painting). After 2 months of active work, up to now, 50% of the progress of the whole year 2019 has been achieved, and the workload is expected to be completed in October 2019.

    In parallel with the items of the Daily Contract mentioned above, along with NSRP’s trust after the success of the Welding inspection phase 1 package from 2016-2017, NSRP continued to sign a contract appendix assigning Phateco to perform the Welding inspection phase 2 package with a much larger workload than the previous time, including services such as RT/ PAUT/ IMI/ LRUT and auxiliary work for NDT (including: installation, scaffolding, surface cleaning and painting). After one month of implementation, nearly 20% of the progress has been achieved, expected to be completed by the end of October 2019.

    To simultaneously implement the above two packages, the Technical and Testing Department has mobilized many NDT equipment with more than 40 officers, employees, and technicians, and at the same time, hired 02 subcontractors to perform scaffolding, insulation, cleaning, and painting work with more than 150 workers. Despite the prolonged hot weather, all construction site workers have tried their best and determined to complete the tasks that the Company has trusted and assigned.

    TRAN DUC DUY